Offgrid Atlas

Solar Wire Size Calculator

Check voltage drop and pick wire sizes for the panel run and the battery run. The calculator also suggests a fuse rating for each circuit.

Reading Your Result

Voltage drop is energy lost as heat in the cable. The result shows it as a percent of circuit voltage, and the limits are 2 percent from panels to controller and 3 percent from battery to inverter. If your number is higher, use thicker wire, shorten the run, or raise the circuit voltage.

Voltage drop is only half the job. A wire that passes the drop test may still be too thin to carry the current safely, so compare the result with the ampacity tables in your local electrical code. Use the larger size when the two disagree.

How It's Calculated

Formula

Drop % = (2 × one-way length m × current A × 0.0172 ÷ area mm²) ÷ system V × 100

Voltage drop. The factor 2 counts both conductors, and 0.0172 is copper resistivity in ohm mm² per meter.
Formula

mm² 1.5, 2.5, 4, 6, 10, 16, 25, 35, 50, 70, 95. AWG 14 = 2.08, 12 = 3.31, 10 = 5.26, 8 = 8.37, 6 = 13.3, 4 = 21.2, 2 = 33.6, 1/0 = 53.5 mm²

Wire sizes. Pick the smallest standard size that meets the drop limit and the ampacity rule.
Formula

Fuse = 1.25 × current, rounded up to 1, 2, 3, 5, 7.5, 10, 15, 20, 25, 30, 35, 40, 50, 60, 70, 80, 100, 125, 150, 175, 200, 225, 250, 300, or 400 A

Fuse. The fuse must protect the wire, so it can't exceed the wire's rated current.

Worked Examples

Worked example · Arizona, USA, panel run in AWG

A string makes 8 A at 96 V over an 18 m one-way run. The limit is 2 percent.

Try 14 AWG (2.08 mm²). Drop = 2 × 18 × 8 × 0.0172 ÷ 2.08 = 4.954 ÷ 2.08 = 2.38 V, and 2.38 ÷ 96 = 2.48 percent. That fails.

Try 12 AWG (3.31 mm²). Drop = 4.954 ÷ 3.31 = 1.50 V, and 1.50 ÷ 96 = 1.56 percent. That passes.

Fuse = 1.25 × 8 = 10 A, which is already a standard size.

Worked example · Norway, battery to inverter

A 2,000 W inverter on a 24 V bank draws 2,000 ÷ (24 × 0.92) = 90.6 A. The run is 1.5 m one way, and the limit is 3 percent.

Try 10 mm². Drop = 2 × 1.5 × 90.6 × 0.0172 ÷ 10 = 0.467 V, and 0.467 ÷ 24 = 1.95 percent. That passes the drop test.

At 90.6 A, 10 mm² is far too thin for heat limits, so check ampacity and step up. At 25 mm², drop = 0.187 V, which is 0.78 percent.

Fuse = 1.25 × 90.6 = 113 A, which rounds up to 125 A.

Common Mistakes

  • Entering the round-trip length instead of the one-way length. The formula already doubles it.
  • Choosing wire only by the drop test and skipping the ampacity table.
  • Using a fuse that's larger than the wire can handle.
  • Running low-voltage panel wiring with one thin cable to save money, then losing a visible share of power every sunny day.

Frequently Asked Questions

Why is the panel limit tighter than the battery limit?

Panel power is the most expensive power in the system, and every lost watt on the array side is a watt you paid for and can't use. Battery runs are short, so 3 percent is easy to hold there.

Does aluminum wire work?

Aluminum has about 60 percent more resistance than copper, so it needs a larger area for the same drop. Many local codes limit or ban it in small DC circuits.

What voltage should I use for a panel run?

Use the string's operating voltage, which is Vmp × panels in series. Higher string voltage means lower current and thinner wire.

Do I add voltage drop for hot wires?

Copper resistance rises with heat, so a hot conduit run drops slightly more than the number shown. A little extra margin covers it.

Does the fuse go on the positive or negative wire?

Fuse the ungrounded conductor, and place it close to the source. Follow your local code and the equipment manual for the exact layout.

Can I use car cable?

Only if its rating and insulation suit the voltage, temperature, and sunlight. Use cable made for solar, which resists UV and moisture.

Related Calculators and Guides

Results are estimates based on typical values and the settings above. Local electrical codes apply, and a qualified installer should check the final design before you buy or wire anything. Read the full disclaimer.