Solar Backup for Power Cuts and Load Shedding

7 min read · Published 2026-11-01 · Last updated 2026-11-17 · Offgrid Atlas Editorial

Many homes have a grid connection that fails often. In South Africa and Pakistan, scheduled load shedding cuts power for hours at a time, and storms and faults cause longer outages in Kenya, Australia, and the United States. A backup system doesn't need to run the whole house. It needs to keep the few loads that matter on until the grid returns. This guide shows how to size one.

Outages and Load Shedding Differ

Load shedding is planned and repeats. A utility cuts power in blocks of two to four hours, sometimes more than once a day, on a published schedule. The battery gets drained and then recharged on a regular cycle. That favors a battery chemistry that handles daily cycling, and it gives time to recharge between blocks.

A random outage is shorter on average but harder to predict. It may last 30 minutes or three days. Plan for the longest outage you can reasonably cover, then add a generator for the rest.

Schedules and stage rules change, so check your utility's current plan rather than trusting a fixed number of hours.

Pick the Essential Loads First

Backup systems get big and costly when they try to run everything. Start with a short list, and leave out heating loads.

  • Lights, fridge, and freezer
  • Router, modem, and phone charging
  • A laptop, fans, or a TV
  • A water pump, if it's needed in an outage

Kettles, ovens, electric heaters, geysers, and standard air conditioners can each draw more than the rest of the list put together. Run them on gas, a gas geyser, or the grid, and leave them off the backup circuit. Many installers wire a separate essential-loads panel for this reason. Use the appliance energy calculator to measure each load.

Size the Battery for One Outage

The battery formula works for backup too. Treat the outage energy as the daily energy, and set days to 1 if the battery refills before the next outage. Inverter efficiency (0.92) applies once, because these are AC loads.

Formula

Battery Wh = daily Wh × days ÷ (DoD × round-trip efficiency × temperature factor)

For backup, daily Wh is the AC energy used during the outage divided by 0.92.

Worked example · Apartment in Johannesburg

An apartment faces two four-hour load shedding blocks a day, or 8 hours without grid power. The essential loads are shown below.

| Load | Average W | | --- | --- | | LED lights | 80 | | Fridge | 90 | | Router and modem | 20 | | Laptop and TV | 150 | | Total | 340 |

AC energy during the outage = 340 W × 8 h = 2,720 Wh.

Daily Wh with inverter loss = 2,720 ÷ 0.92 = 2,956.5 Wh.

Battery with LiFePO4 at room temperature = 2,956.5 × 1 ÷ (0.90 × 0.95 × 1.00) = 2,956.5 ÷ 0.855 = 3,458 Wh.

Inverter continuous = 340 × 1.25 = 425 W, which rounds up to a 600 W inverter.

Surge check. The fridge is the largest motor load, so it sets the surge watts figure at 90 × 3 = 270 W. The others add 340 − 90 = 250 W, so surge needed = 520 W. A 600 W inverter handles that.

Solar to refill it. Winter in Johannesburg gives about 5.0 peak sun hours. Array = 2,956.5 ÷ (5.0 × 0.80) = 2,956.5 ÷ 4.0 = 739 W. Two 400 W panels give 800 W.

At 800 W the array is under 1,000 W, so the system voltage is 12 V. The 3,458 Wh bank is then 3,458 ÷ 12 = 288 Ah. The controller is 800 ÷ 12 × 1.25 = 83.3 A, rounded up to 100 A. The inverter draws 600 ÷ (12 × 0.92) = 54.3 A, so the battery fuse is 1.25 × 54.3 = 67.9 A, and a 70 A fuse fits.

Adding a 1,500 W kettle changes the math. Running load becomes 340 + 1,500 = 1,840 W, and 1,840 × 1.25 = 2,300 W, which rounds up to a 3,000 W inverter. Boiling water on gas avoids that jump entirely.

How Outage Length Changes the Battery

The same 340 W load needs very different batteries depending on how long the grid stays down. All values use LiFePO4 at room temperature with the 0.92 inverter factor and the 0.855 battery factor.

| Outage length | Load energy | Battery nameplate Wh | | --- | --- | --- | | 2 hours | 680 Wh | 864 | | 4 hours | 1,360 Wh | 1,729 | | 8 hours | 2,720 Wh | 3,458 | | 12 hours | 4,080 Wh | 5,187 |

Battery size grows in a straight line with outage time. Doubling the outage doubles the battery. The battery runtime calculator answers the reverse question, which is how long a battery you already own will last.

Pick a Battery Chemistry for Cycling

Load shedding means regular deep cycles, and chemistry changes the size and the cycle life. Using the Johannesburg load of 2,956.5 Wh, the nameplate needed is shown below.

| Chemistry | DoD and efficiency | Math | Nameplate Wh | | --- | --- | --- | --- | | LiFePO4 | 0.90 and 0.95 | 2,956.5 ÷ 0.855 | 3,458 | | AGM | 0.50 and 0.85 | 2,956.5 ÷ 0.425 | 6,957 | | Gel | 0.50 and 0.85 | 2,956.5 ÷ 0.425 | 6,957 | | Flooded | 0.50 and 0.80 | 2,956.5 ÷ 0.400 | 7,391 |

LiFePO4 needs about half the capacity of lead-acid, because it can use more of its rating each cycle. Read LiFePO4 vs lead-acid batteries for lifespan and handling differences. The depth of discharge and watt-hours pages explain the ratings. Cold garages change the answer, so see the winter design guide if the battery sits outdoors.

Grid-Tied, Hybrid, and Off-Grid Options

Three setups cover most homes.

  • A standalone backup inverter with a battery and a grid charger runs the essential loads and charges from the wall
  • A hybrid inverter adds solar input, so panels, battery, and grid work together in one unit
  • A fully off-grid system skips the utility entirely, as described in the full sizing guide

A grid-connected system must disconnect from the grid during an outage so it doesn't push power onto lines that crews may be repairing. Most hybrid inverters do this automatically with a built-in transfer switch. A standalone inverter feeding a separate essential-loads panel does it by design. A plain extension lead from an inverter to a wall socket is not safe.

Plan for Long Outages With a Generator

Some outages outlast any sensible battery. Rather than buy a huge bank, add a small generator for the long events and keep the battery sized for the usual ones. The generator also fills in during long cloudy spells.

Formula

Generator hours per month = shortfall kWh ÷ (generator kW × 0.85)

The 0.85 factor allows for the real output of a generator under load.

Worked example · Monsoon Month in Lahore

A home in Lahore uses 3 kWh a day, or 90 kWh a month. In a cloudy monsoon month, solar and batteries supply 72 kWh, so the shortfall is 90 − 72 = 18 kWh.

With a 2 kW generator, hours = 18 ÷ (2 × 0.85) = 18 ÷ 1.7 = 10.6 hours a month.

With a 3 kW generator, hours = 18 ÷ (3 × 0.85) = 18 ÷ 2.55 = 7.1 hours a month.

The larger unit runs fewer hours but burns more fuel per hour, so test both in the generator backup calculator with your own numbers.

Test the Plan Before You Need It

A backup system is only useful if it works on the day. Turn off the main breaker once or twice a year and run on battery for an hour. Check these points.

  • The essential loads all start without tripping the inverter
  • The battery voltage stays well above the inverter's low-voltage alarm
  • The transfer switch works and the grid charger resumes when power returns
  • The battery's state of charge matches what the monitor shows

Kenya, South Africa, Pakistan, and Australia all have different grid rules and different failure patterns, so the plan should match the local one. Check the inverter size calculator and the solar panel size calculator for your own numbers. The off-grid planner ties them together. For long outages, read how many days of battery autonomy to decide how much reserve is enough, and see choosing the right inverter size for surge details on pumps and compressors.